Pembroke Road & Miramar Parkway Expansion to US 27
Project benefits include regional roadway network connectivity, reduced congestion on Pines Boulevard and Miramar Parkway, and an alternate emergency evacuation route for western residents.
SCOPE
Expand and extend Pembroke Road to be a 4-lane divided roadway from Dykes Road to US-27; and extend Miramar Parkway as a 2-lane roadway from SW 192th Terrace to Pembroke Road. Project includes medians, landscape, lighting, and some buffer walls along residential areas.
SCHEDULE:
Design starting in 2022 and Construction starting in 2026.
Segment A
Reconstruct Pembroke Road from a 2-lane to 4-lane divided roadway with multi-use paths. Starting 2026
Segment B
Extend Pembroke Road as a 4-lane divided roadway from SW 196th Avenue to US-27 with multi-use paths and install a signal at the intersection with US-27. Starting 2028
Segment C
Extend Miramar Parkway as a 2-lane roadway with multi-use paths from SW 192nd Terrace to intersect with the extension of Pembroke Road. Starting 2030
Please use the interactive map below to review the project in detail and submit your comments or questions.
Open Map